JIMMY THE MECHANIC'S BATHROOM

GENERAL DESCRIPTION:

  • COMPLETE GUT-OUT AND RENOVATION OF BATHROOM
  • EXTEND BATHROOM TO MAXIMUM LIMITS
  • REPLACE ALL FIXTURES
  • REPLACE ALL PLUMBING AND ELECTRIC

TOTAL COST:

$18,000.00

TIME TO COMPLETE:

1 MONTH

 

BEFORE

Before our good friend Jimmy the mechanic called us his bathroom was in very bad shape. It was a small, uncomfortable bathroom that was suffering from a major shower leak. It was clear the bathroom needed to be completely replaced and redesigned. We did not hold anything back for this one of a kind bathroom that Jimmy and his family can enjoy for many years.

 

AFTER:

After total demolition, complete re-plumbing, re-wire and re-framing the new bathroom did not compare to the old one. The leak was a lot worse than we thought and everything was removed and properly treated. The bathroom was extended to the maximum allowed by the existing conditions. We designed and built a much bigger stand up shower with a great seating bench, custom made marble sills and designer fixtures. We also created a storage space completely tiled with a custom marble frame. The bathroom is completely tiled, walls, floors and ceilings and is completely waterproof. The beautiful tiles and fixtures were picked out by Jimmy’s wife and they are the star of this project.

 

DURING CONSTRUCTION: